Peel back 300 600 mm 1 2 ft of release liner align membrane.
Roofing ice water shield installation.
Not only does ice and water shield installation stop leaks caused by ice dams but it also stops leaks created by fierce wind driven rain.
It s an asphalt saturated paper that increases the water resistance of your roof from wind driven rains or blow offs.
Cut the membrane into 10 15 ft 3 5 m lengths and reroll loosely.
You should install ice and water protector before other underlayments including roof felt.
Minimum overlap guidelines are set by the manufacturer.
This shield protects vulnerable areas on your roof where the shingles cannot.
Rain ice protection underlayment.
It s a great product but like most materials there are quality shields and then ones that should be avoided.
Ice and water protector needs to be installed directly onto the roof deck after you have placed the drip edge at the.
How should ice and water protector be installed on a roof.
Felt paper or tar paper is also a rolled material you see roofers nailing down under shingles.
Yes ice and water shield will protect your home from leaks caused by hurricanes.
Does ice and water shield protect against hurricanes.
Ice water shield acts as an excellent back up protection in case any of these areas has a small leak or failure.
If you see ice and water shield being installed you might think it is felt paper.
Install gap roofing waterguard rain ice underlayment according to adopted building code requirements.
Peel the release liner from the membrane.
Around roof features like.
Ice and water shield products are hidden by the finished roofing materials.
Install the ice barrier membrane according to the manufacturer s instructions with the drip edge installed on top of the membrane.
Shingles are important but so is the ice water shield protection that goes underneath them.
Gcp requires side laps to be a minimum of 90 mm 3 5 in and end laps a minimum of 150 mm 6 in.
Apply roof covering material at temperatures of 40 f 5 c or higher.
Then install regular roofing underlayment tar paper over the top of the drip edge and over the ice barrier and continuing all the way up the roof.
Apply grace ice water shield underlayment in fair weather when the air roof deck and membrane are at temperatures of 40 f 5 c or higher.