Some panels have pre drilled holes.
Roof sheet installation.
Step 3 installing liberty self adhered cap sheet.
And scroll down to see more details on each with installation hints and tips below.
If yours do not then you will need to drill holes.
You ll want to order metal panels that are an appropriate color and look to complement your.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
For best weatherproofing begin installing your sheeting on the side opposite the.
Cover sheathing with.
Remove the old roof.
How to install roof sheathing 1.
Keep these tips in mind when roofing in hurricane areas.
Learn about the liberty sbs self adhering base ply sheet.
Place the first screw.
Measure from the peak of the roof along each rafter on one side of the roof to determine the exact length of each.
Properly fasten panels including fastening and spacing hints step 4.
Liberty sbs self adhering roofing system will provide long lasting protection for the low slope areas of your property without the danger or hassles associated with the installation of other conventional roofing products.
Cut the panels to the desired length.
This video shows how some roofs fail under heavy winds in uplift situations.
Roofing installation guide orient sheets before lifting.
Use your neoprene washer head screws to secure the metal to the sheathing.
During a hurricane the strength of the sheathing on the roof can greatly impact the homes ability to weather the storm.
Most panels come up to 32 feet 9 8 m in length.
Take care the first piece is aligned precisely perpendicular square to the edge.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Prime the face on the roof and allow to dry before installing cap sheet.
You will need to order enough metal material to cover the entire roof and this process.
Where do i begin.
Allow for a minimum of 18.
Make absolutely sure the first sheet laid is properly positioned.
Align cap sheet 1 4 from the edge at the lowest point of the roof.
Ventilate the roof according to current building codes step 3.
Install edge flashing over the base sheet in a 1 8 bed of cement and stagger nail with two rows of roofing nails 3 o c.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Position your next sheets.
Cut each rafter tail on the chalk line with a circular saw to ensure that every rafter is the same length.
Measure the roof area.
Position the first piece of plywood.
Check the nailing surface is level step 2.
Space the screws about 12 in 30 cm apart down the entire piece of metal.
Pre drill holes on the ridges.
The connection between the roof sheathing and the structure is a vulnerable point that is known to fail during a hurricane.