Make sure that the screws are all aligned evenly as you will be able to see them from the ground if they are.
Roof panel installation.
A 9 45 kw solar system installed on a 1 800 square foot roof costs between 39 600 and 81 000.
Use your neoprene washer head screws to secure the metal to the sheathing.
This video provides a basic overview of installation for palram s consumer oriented corrugated roofing products including suntuf suntop palruf sun n.
Place the leading edge of the first panel along this line.
Pbr panel safety study applicable osha and other safety requirements before following these instructions.
Remove the old roof.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Measure one panel width in from the roof edge.
Most panels come up to 32 feet 9 8 m in length.
For exposed fasteners avoid over tightening the fastener.
Cut to fit pitch of roof and around vent.
The installation of metal roof systems is a dangerous procedure and should be supervised by trained knowledgeable erectors.
Pre drill holes on the ridges.
Cut the panels to the desired length.
Space the screws about 12 in 30 cm apart.
You ll want to order metal panels that are an appropriate color and look to complement your.
Install the roofing screws vertically along each rib in the panel.
For use by its customers.
Overlap roof panels one corrugation away from prevailing wind and nail to rafters starting from one end.
Install vent as close to roof peak as possible.
5v crimp roofing must be applied on a minimum roof pitch of 2 12 or greater.
Apply front and back panels similarly to side walls.
5v crimp installation guidelines caution.
Panel installation should begin at the gable end of the roof opposite the prevailing rain bearing wind this will provide added assurance against wind driven rain being forced under the laps.
Use extreme care while installing roof panels.
You will need to order enough metal material to cover the entire roof and this process.
At this point chalk a line from ridge to eave.
Measure the roof area.
This guide must by read and understood in its entirety before beginning installation.
Installing corrugated roofing 1.
Place the first screw.
Some panels have pre drilled holes.
Allow for a minimum of 18.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Adjust door construction to desired size.
This is intended to be a guide only and does not.