Inspect rafter materials and allowable spans r 802 1 r 802 5 tables r 802 5 1 1 r 802 5 1 8 a.
Roof framing checklist.
R802 3 the rafters are framed opposite each other at the ridges.
1 roof constructed in accordance with approved layout.
Locate the grade mark on the rafter to determine species and grade.
2 bracing section 8 3 coupled roof connections ceiling joists to rafters collar ties to rafters 7 1 2 2 4 tie downs section 9 5 transfer of wall frame bracing 8 3 6 9 6 point loads including beams struts are adequately supported.
Toe nail rim board to sill plate at 6 on center.
Determine if studs are toe nailed to sole plates with at least 3 8d or 2 16d nails.
Job address is posted in a visible location per irc section r319 1.
Approved documents which show.
For all new construction.
Determine how many rafters you ll need for the roof.
Permit residential framing checklist approved city stamped plans roof specifications and engineered floor system information is on site and accessible to inspector.
Wall framing inspection checklist continued m.
The american plywood association says there s no reduction in strength for nails overdriven by 1 16in.
Add studs under all double girder truss double joist.
The fields in the template include equipment standards of workers.
Determine if continuous headers are toe nailed to studs with 4 8d nails.
Building is safe and accessible.
For most load bearing requirements a roof truss will need to be placed every two feet along the walls.
Depending on how wide the home is you can divide the total length in feet by two to determine how many trusses will be needed.
Determine if double studs are face nailed with 10d nails at 24 in.
Roof framing inspection checklist 1.
In high wind areas sheathing along the eaves rakes and ridges is nailed every 6 in.
Truss roof framing as per design.
Get fix for any cut damaged joist or truss from joist or truss company.
Along the edges and every 12 in.
Daily safety inspection report sample is an audit report which is obviously crucial for any company to track the health and well being of the employees.
R802 3 notches on the ends of rafters don t exceed the nominal joist depth.
Roof must be complete before framing inspection.