Drip edge or drip cap is either plastic or sheet metal.
Rolled roofing installation instructions.
Spread the roofing cement along the.
To guide the installation snap a chalk line 5 from and parallel to the joint on both sides.
Roll roofing a small flat roof with greg zanis weatherwatch this quality gaf leak barrier helps keep water out of the most vulnerable areas of your roof inc.
10 easy steps for diy rolled roofing installation 1 spend some time cleaning the roof before beginning a rolled roofing installation project.
Do not use the eaves as a guide instead because they can be uneven.
Attach it to the valley with roofing nails spaced 6 inches apart about 3 4 inch from the edge.
It has a life expectancy of anywhere from six to 10 years but it s fairly inexpensive.
Snap a chalk line as a guide for the first layer roofing.
Roll roofing is a good choice for covering an existing roof.
Install a drip edge around the perimeter of the roof.
The roll roofing should be clean and dry when it s installed.
Don t install roll roofing whose.
Cut the sections of flashing with tin snips as needed and nail.
This aluminum flashing protects the edges of the roof sheathing from water.
Cut the rolled roofing.
That means 2 inches of rise in 12 inches of horizontal run or steeper.
2 like any other roof project you should start this one by addressing the valleys.
Mark a chalk line to identify the end of your first layer.
It not only protects the roof but it also protects the fascia.
Installing the rolled roofing 1.
It can be installed simply and requires only nails and roofing cement.
Apply asphalt plastic cement evenly over the entire area between chalk lines from one side of the joint to the other.
Roll roofing is a lightweight roofing material that s sold in a large roll.
Typical roll roofing installation steps specifications roof slope.
Install peel and stick roofing in a similar manner.
To seal a plumbing vent spread roofing.
Plan so that no two butt joints are closer than 2 feet from each other.
Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Apply roofing cement to the roof.
How to do it attach first course.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Using a measuring tape measure 35 inches 89 cm up from.